Tender now open: Singapore Tourism Board (STB) launched the 37 Emerald Hill Concept and Price Revenue tender on 16 September 2026. The six-month tender closes on 16 March 2027; no winning proposal, operator or construction opening date has yet been announced.

One of the most historically loaded pieces of land beside Orchard Road is being lined up for a new chapter. STB is inviting local and international bidders to propose a mixed-use redevelopment for 37 Emerald Hill, the former Singapore Chinese Girls’ School grounds at the meeting point of Somerset and the Emerald Hill Conservation Area.

The brief is deliberately more ambitious than “put a hotel here”. STB says the future development should combine conserved and new buildings, a new-to-market hotel concept, first-of-its-kind lifestyle experiences and accessible public spaces with year-round programming. The stated aim is to create a new draw for both Singapore residents and visitors while supporting the wider Orchard Road Rejuvenation Plan.

The useful distinction: this is a tender-stage plan, not an announced development with a selected operator. The land-use parameters are real and public; the eventual design, brands, tenants, room count, opening date and construction programme are not yet settled.

01 · What exactly has STB launched?

STB describes the exercise as a Concept and Price Revenue tender for mixed-use development at 37 Emerald Hill. The tender opened on 16 September and is scheduled to run for six months, with proposals due by 16 March 2027.

The 1.04-hectare site sits just off the Orchard Road shopping belt and next to the Emerald Hill Conservation Area. STB’s release places it within the long-running Orchard Road rejuvenation effort, but the pitch is not simply more retail floor space: bidders are being asked to use heritage, hospitality, leisure and public-space programming to create a destination in its own right.

That makes the next phase important for two quite different audiences. Residents will care about how a major central-city site is opened up, programmed and integrated with an established conservation precinct. Travellers will eventually care about whether the project adds a distinctive place to stay, eat or spend time within walking distance of Somerset and central Orchard Road.

02 · The land parcel: hotel and commercial uses, not housing

STB’s published land-parcel annex puts hard numbers around the concept brief. The site area is 10,414.8 square metres, with a maximum gross floor area of 16,664 square metres. The stated land use is Hospitality and Commercial.

The lease term is 50 years, with an option to extend for another 20 years subject to terms and conditions. Hospitality and commercial uses are to predominate.

STB lists restaurants, bars and pubs, outdoor refreshment areas, shops, fitness centres, gyms and medical clinics as examples of allowable commercial uses. Just as useful is the exclusion list: residential uses, offices, serviced apartments and schools are not permitted under the published tender parameters.

In other words, the brief points toward a visitor-facing and leisure-oriented precinct rather than a private residential redevelopment or conventional office project.

03 · Why the heritage requirement matters here

The location carries more history than a typical Orchard Road development parcel. The Singapore Chinese Girls’ School was founded in 1899 to provide modern education for Chinese girls at a time when that idea was socially radical. National Heritage Board material records that the school moved to the Emerald Hill site in the 1920s and remained there until relocating in 1994.

URA’s conservation portal identifies the former Singapore Chinese Girls’ School Principal’s House at 37 Emerald Hill Road as a conserved building. The wider Emerald Hill precinct is also one of Singapore’s best-known historic residential areas, with terraces that mix Chinese and European architectural traditions.

That context explains why STB repeatedly frames the tender around a “masterful integration” of conserved and new buildings rather than a blank-site development. It also raises the design stakes. A successful proposal will have to work as a modern hospitality and lifestyle destination without treating the site’s school history and the neighbouring conservation streets as decorative scenery.

04 · STB wants public space and year-round activity

One of the more consequential lines in STB’s brief is the requirement for accessible public spaces with year-round programming. The agency says this is intended to support consistent footfall and community engagement.

That matters because many high-value central sites can feel private once redevelopment is complete. STB is instead signalling that 37 Emerald Hill should function as a place people can enter, use and return to, not only as accommodation for hotel guests.

The exact form of those spaces is still open. There is no published final plaza plan, events calendar or confirmed tenant mix. What is clear is the desired outcome: a site where heritage, hospitality and public life overlap rather than sit in separate boxes.

05 · What it could mean for the Somerset–Orchard stretch

37 Emerald Hill sits at a useful hinge point. One side faces the high-footfall Orchard Road/Somerset shopping corridor; the other connects into the much quieter historic texture of Emerald Hill. STB explicitly wants the development to strengthen Orchard Road as a lifestyle destination and encourage longer stays and repeat visits.

For visitors, a strong proposal could add a heritage-conscious hotel and a cluster of food, drink, retail or wellness experiences that feel more rooted in the site than another generic mall extension. For locals, the more interesting test may be whether the public realm is genuinely welcoming and whether programming gives people a reason to return after the novelty of opening wears off.

Those are outcomes to judge later, not promises to assume now. The tender tells us what government wants bidders to solve; it does not tell us which bidder will win or how convincingly the eventual proposal will deliver it.

06 · What has not been decided yet

  • No successful bidder has been announced. Submissions are not due until 16 March 2027.
  • No final architectural design has been selected. Artist impressions published with the tender illustrate the redevelopment ambition; they are not proof of a final scheme.
  • No hotel brand, room count or tenant list is confirmed. STB asks for a new-to-market hotel concept and distinctive lifestyle experiences, but leaves the proposal details to bidders.
  • No public opening date has been announced. Any construction or launch timeline beyond the tender schedule would be speculation at this stage.

That is why this story is worth tracking over time. The September 2026 announcement establishes the development brief; the next major factual milestone should be the tender outcome and the details of the selected concept.

07 · The dates and numbers to keep

  • 16 Sep 2026: STB launches the tender.
  • 16 Mar 2027: scheduled closing date for proposals.
  • 10,414.8 m²: published site area.
  • 16,664 m²: maximum gross floor area.
  • 50 years + possible 20-year extension: published lease framework.
  • Hospitality + commercial: stated land-use focus.

If you are visiting Orchard Road now, nothing in the tender changes access to the surrounding Emerald Hill conservation streets. This is a future-development story, not a current closure notice.

08 · Sources and verification

This report uses the current primary-source tender material and official heritage records:

Details checked 18 September 2026. The project is at tender stage; we will treat a future award, design or opening timeline as confirmed only when an authoritative source publishes it.